This manual demonstrates with examples, how to start using Tuntinetti and how it's basic functions work.

 



 

Wizards

Basic information wizard

When you log in to the system for the first time, Tuntinetti will start with a wizard, which helps you to get started quickly. The wizard will guide you with adding the first information to the system. If you need to stop the wizard, you are always able to return to it later. All the information will be saved instantly, but at any time you can go back to change things and you are also able to jump between all the different parts of the wizard. You can always click the Help -button, when you want in depth instructions.


Unit Wizard

In unit wizard you can determine your company's structure. In Tuntinetti the company consists of units, which can represent for example your company's headquarters and their departments. Units can be ordered under each other, how ever it's logic from your company's point of view.

 

Organizing units

Tree diagram displays possible examples for the company's structure.


 

Creating a new unit

Lets create a new unit. The Create new unit -button start the process.

 

First write the unit's name and choose whether you want to enter the hours straight into that unit or not.


Move forward by clicking the Next -button.

 

Now you can place the new unit to your company's structure.

Tuntinetti has automatically created one basic unit to the structure's base level. The unit's name is the company's name. Other units can be created under this unit or next to it to the base level.

 

Click the radiobutton next to the basic unit. Now the new unit will go under it.

 

Lets move forward by clicking the Next -button.

 

The new unit is now created and will be visible in the unit list.

 

Modifying and removing units

At this page you are also able to modify the structure of your company by dragging units under each other or to the base level.

You can also modify and remove existing units.


Employee wizard

At the employee wizard you are able to add employees who also become Tuntinetti's users.

Tuntinetti has already created an employee which has been named based on the registration information.


Add a new employee

You are able to create new employees with the Add new employee -button. In the first stage of the process you must write down the employee's basic information:

  • Write the employee's name.
  • Choose the language, which the employee will use in Tuntinetti.
  • Add the employee's email address.
  • You can send an invitation to use Tuntinetti to the employee immediately.  
  • At the Require detailed reports -part you will choose if the employee will need to specify work tasks and possible expenses. Otherwise the system will only ask the working hours which is more suitable for routine like jobs.

You are able to add more than one employee with the Add another employee -button and remove them with the Remove -button.


When the basic information is filled, move the the next page by clicking Next -button.

 

At this page the employees will be placed to units. Be aware that the placing is mostly for structure and that employees don't always have to work at their own unit's projects. You will also set the User privileges for the employee.


Lets select an unit for the employee. By clicking Create a new business unit -button you can also create a new unit.


The employee's privileges can be normal user, administrator or unit manager. Normal user is able to control his own time reports, vacation plans and personal settings. Unit manager can normally control those same things on the whole unit level possibly including it's subunits. Administrator is able to control any information in Tuntinetti. From the User privileges menu you are able to choose either normal user or administrator for the employee. Unit manager privileges can be set by first choosing normal user privileges and then setting it from Add privileges to another unit -button. Unit manager privileges can be set to multiple units for the same person and they can later be modified in detail. Choose the user privileges and move forward by clicking Next -button.


At this page you will define the employee's contracts: the starting date of the contract, labour agreement, work time mode and salary.


In this view you are able to modify the following options:

  • Write the start date of the contract. It can also be set from the calendar menu.
  • Choose the labour agreement. There are lots of choices but if the suitable one is missing, you can choose (Jos muu niin kerro mikä, voimme lisätä toivomuksesta), this means "If something else, tell us what", and write the labour agreement you want. This way our customer support will add it to the system and inform you about it with email. 
  • The work time mode fields will be filled based on the labour agreement. They can be modified if needed.
  • Next write the salary information. If you don't find it necessary to use the Tuntinetti's payroll functions, the salary mode is enough: bill, hourly salary or monthly salary. 
  • From the gear -icon you can set additional information for example employee benefits if needed.

 

Move forward by clicking the Next -button.

 

This page has a summary of created employees.


Project wizard

In the project wizard you are able to add projects to the company's units and define work tasks, organization costs and customers connected to the projects. It's also possible to add employees to the projects.

There is a diagram about the company's units. Also the projects below each unit are shown. The projects can be moved from one unit to another by dragging them over unit's names.


Creating a new project

Lets create one example project by clicking Add another project -button.

 

In the first stage of the process you must write down the project's basic information:

  • Write the name of the project.
  • Choose the time structure of the project. Choices are named based on the use of them. Assignment type means that the project has a start- and end date. Service type means that the project is always in effect.
  • You can also define the hourly price for the project, total budget can be estimated for the assignment type project.

 

Lets move forward by clicking the Next -button.

 

At this page you will choose the projects unit.

The choice is made with the radio buttons.

 

Lets move on by clicking the Next: Customer wizard > -button.

 

Customer wizard

At this page you are able to place customers to the project. This will be done when the work related to the project will be billed from the customers, and the time reports about the work is needed to specify by customers. The system remembers the created customers and they can be placed to other projects as well if needed.

 

Choose if you want to place all the customers of the unit's project to the project, the unit's subunit's customers as well or the customers of the whole company's projects. With the first choice it is possible to place customers one by one. Lets create an example customer. 

 

Write the customer's name and ID. The ID will be the Business ID.

Next write the email, which is required for some optional functions in Tuntinetti.

 

After that move forward by clicking the Next -button.


The customer can be placed to an unit of a project. The placing will structure the customer to the system, but it does not restrict his use in any unit or project. At this window the customer will be placed to an unit and in the next one it will be placed to a project.

 

The customer will be placed with the radio button.

 

Move forward by clicking the Next -button.


The new customer can now be placed to projects. This is done by checking the checkbox next to the project. Customers can also be placed to multiple different projects.

 

Lets move forward by clicking the Next: Summary > -button.

 

Task wizard

At this point the wizard will offer you a possibility to place tasks to projects. The task will be specified this way if it is needed to bill them in detail or when you want to monitor the amount of them in time reports precisely.

Choose Yes and click the Next -button.

 

At this window you will need to write the basic information of the task:

  • Name (required)
  • Id (optional and free-form)
  • The hourly price that is billed from the customer.

 

Move forward by clicking the Next -button.

 

At this window you are able to place the new task to a project.

The task will be placed with the checkbox.


Lets move forward by clicking the Next: Summary > -button.


Organization cost wizard

Now the wizard will offer a possibility to place organization costs to projects. Organization costs are running costs like, equipment costs or mileage coverage. The organization costs that are placed to projects can be placed to time reports and they will go for example to payroll that way. 

Choose yes and move on.

 

Place organization costs to projects

At this page you will write the basic information of the cost:

  • Name of the compensation unit, which is required.
  • Next you are able to choose the availability of the cost. Lets leave it to the default now.
  • Next choose who will be able record that compensation: is it for everyone or just for the supervisor. The cost can also be hidden for others than the supervisor. 
  • Choose whether the compensation unit is auto suggested or not.
  • Lastly choose whether the description for the compensation unit is required.


Lets move forward by clicking the Next -button.
Next give a shortname for the organization cost. Also add other possible settings and the information that is required by the time reports.
 

Lets move forward by clicking Next -button.

At this page you will see the summary of the costs and here you are able to place organization costs to projects.

Make sure that the right costs will be selected (the checkmark means that the cost is in use).

From the Modify -link you are able to go back to edit the cost if you notice a mistake in the information.

Lets move forward.

Employees to project -wizard

From the list at this page you can choose employees to a project. The list is structured based on the units.

By checking the checkboxes you are able to choose the wanted employees.

By checking the checkbox on the right side you will give the employee a right to enter the whole project's employee's hours. This is useful for an employee that has a team leader role.

 

Lets get back to the summary of the employees by clicking the Next: Summary > -button.

 

Many things are connected to a project, but it can be viewed as a whole at the summary -page.

By clicking the sub header bars you are able to see the summary of each section.


The structure of Tuntinetti

Tuntinetti is organised by themes as sections under tabs. 

The program contains lots of content, so the tabs are separated with sub tabs.


Users

Users > Employees

At the employees tab you are able to handle user's settings. There you are able to create new users and modify or remove existing ones.

 

The grey area has a search field, where you select the employee who's information is shown below at the white area.


Lets create a new user by clicking the Create new user -button.

The white area is now cleared so you can write the new user's information. 

Tuntinetti will often give you notifications to the top of the page about using Tuntinetti properly. Now the new user needs at least name, contact information and possible employee contract history.

Confirm the changes by clicking the Save changes -button.

 

When the user has a name saved you are able to add skills to him. The skills represent the user's ability in different jobs or for example language skills. By adding skills you make the employee placing process easier.

Next click Employee skills -button.

Here is a list of skills. The skills are structured under skill groups.

 

Lets create a new skill group.

 

Create a new skill under the new skill group.

 

The skill can be applied to an employee by checking the checkbox next to the skill.


The notes contain notes about the user. They can be for example notices or repeating reminders about the user. The notices are visible and the reminders will go to the persons that are marked in the email field (typically the supervisors).

 

Lets place the employee to a project.

Here you can browse projects one by one. The left box contains units and the right box contains the projects inside the chosen unit. You are able to make multiple choices with the shift- and ctrl -buttons.

The employee will be placed to a project by clicking the Assign user into selected projects -button. 

 

There is a new row for the employee's projects below. Fill in the needed information.


The employee is missing the information about tax card. By clicking the Create a new tax card -button you will open a form to fill in the information.

Fill the form and save the information.


Click the Earned vacations, flex time and payments > -button. The vacations that the employee has earned will be entered here. (Notice: that the hour balance changes after the start balance, are recommended to do here as well, because that way they will be saved to history).

 

Lets create a vacation as an example.

After filling the information you will need to remember to save the changes.

 

Next lets send an invitation to the user. You are able to get to send the invitation by clicking the mail -icon.

Choose to send the user ID in the invitation and send the invitation by clicking the Perform action -button.


Recruiting

Lets check how to accept a job application and how to add a job seeker as an employee.

Recruiting > Applications

The job ads and applications are handled at the Recruiting -tab.


The database already has one application and the person has been interviewed. Lets search that application, so we are able to accept that person as an employee. (There is no need to change the search options in this case).

 

Lets change the application status to "Recruited".

When the Employed checkbox is checked, the employee is shown also at the Users -tab.


 

Work shifts in the Work shift planning view

Creating a nimetön shift

Creating work shift in Tuntinetti is easy in the work shift planner (Work shifts > Work shift planner). Shifts can be created even if the worker is unknown.

When this is the case, you should choose a day from the "nimettömät vuorot" lane in the planning view.

In the window that opens up you are able to create an open shift with desired parameters.

The created shift will be visible in the planning view.

Creating a recurring shift

A shift can be recurring in the shift's recurrence settings.

Click the recurrence settings-button in the shift's basic settings. The basic settings view can be entered by clicking a shift in the planning view.

 

In the cycle setting window you are able to edit the details of the recurring cycles.

  • Set the Work shift. You are also able to write down notes in this field, for example "8-16 Remember to lock the doors"
  • Set the Start and End dates.
  • Set the recurring work shift's cycle in the Cycle-section.
  • In the Allowed days-window you are able to set the shift's exact validity.
    • For example with this you are able to set that the shift won't be on holidays.
  • Save the changes with the Save changes-button


The work shift is visible on the days that it is set to be on.

Recurring shifts have an arrow-icon on them ().

Recurring shifts can all be removed at same time with the "Remove"-button. You can remove them all from a single shift's settings. Any alterations made in a single shift's settings affect in all of the rest shifts of the recurring shift.

 

More information about recurring shifts and another way of creating them can be found in the Recurring work shifts-guide.

Projects

In Tuntinetti work time is entered by projects. So that you are able to enter work time, you must first create needed projects and assign employees to them. 

Creating a new project

Here is explained how you can create a new project and the settings that you can set to a project. In addition here is also explained how you can add customers, employees and tasks to a project.

 

You can create new projects in the Projects tab.

After opening "Projects" tab you can search for already existing projects and examine their information, or create entirely new projects. Here are the search settings found on top of the page:

  • Quick search   (Search for already existing projects by entering their name)
  • Filter   (This affects the visibility of projects. The link next to the menu allows you to filter projects by date)
  • Filter by unit   (Select the unit of the project you're searching for. When creating a new project, select the unit you want the project to be part of)
  • Select project for working hours control   (After selecting a project, it's information appear on the page for you to examine)

 

To create a new project, select a unit that it is joined to. Every project must be joined to a unit. This is not necessary if the company is not divided into units.

There are three ways to create a new project. The links to each of these can be found next to the search tools:

  • Create new  (Creates an entirely new project)
  • Copy as base  (Copies the information of currently selected project as a base for a new one)
  • Create new project and private customer   (Creates a new project along with a new private customer. The link opens a window to create the customer and then allows you to fill the project information)

Let's create a new project by selecting "Create new". This brings up a notification indicating that a new project has been created. After this you can fill in the basic information.

Basic information of a new project

Creating a new project brings up a notification indicating that a new project has been created. After this you can fill in the basic information:

  • Project name   (Mandatory information)
  • Project ID   (Here you can fill in the timecard ID)
  • Alternate ID
  • Buyer construction site number
  • Construction site id for reporting
  • Project's employees addition 
    • To be selected one by one
    • Automatically add all employees of the project's unit
    • Automatically add project's unit's and subunits all employees
    • Add all employees automatically   (This means all the employees in your company)

 

"Cost center's state" selector allows you to choose if the project uses timecards or work time buttons. You can press "Reactivate" -button to activate the setting. The printer icon opens up a window, that contains all of the project's work hour control IDs.

 

Save the new project by clicking "Save changes" button. After doing this the program might give you a notification indicating that there are no employees attached to the project.

Tuntinetti may bring up a notification indicating that there isn't any employees added to the project.

Adding an employee to a project

Next we'll go through the employee settings and how to add emloyees to a project.

 

This can be done under the "Project employees" title where you'll also find all the employees that are already attached to the project. If there are no employees added to the project, the field is empty.


To add new employees, simply select them from the list in the gray box below the project's employees. You can filter employees by their unit and use keywords to find the employees faster. You can select multiple employees simultaniously by dragging them with the left mouse button pressed down or clicking them with shift or ctrl button pressed down.

After selecting the employee(s) press the button below to confirm and add them to the project. After doing this the employees will show up on the list above. Now you can fill in their information.

Note that you can only add already existing employees to a project. You can create new users from the Users tab.

 

Employee information

You can get more information about some of these by moving the mouse over the titles.

  • Valid from  (The date from which the employee is able to log work hours for the project. Mandatory information)
  • Valid until  (The date from which the employee is no longer able to log work hours for the project. By pressing the title above you can invalidate all employees at once)
  • Temporary employee  (Crossing this marks the employee as temporary. Crossing the box next to the title does the same for all employees on the list)
  • Series  (This setting is useful if the employee has multiple ongoing contracts with the same employer)
  • Hourly rate  (Hourly price for the work conducted by the employee. If you need more complex pricing, press the "Pricing" link)
  • Pricing  (Sets a more complex pricing for the employee. Use this if you, for example, want the price to change according to weekdays)
  • Accepts  (Crossing this means the employee can accept the work hours of other employees on the project)
  • Compensation categories  (Crossing this allows the employee to enter "only superior" -type compensations)
  • Task description   (Here you can add a description af the task, or other extra information)
  • Remove   (Removes the employee from the project. This can be done only if the employee has no hours logged for the project)
  • Add an ovetime assignment   (Opens up settings for adding the assignment. The setting appear below the employee's settings)

The settings that appear after pressing the overtime assignment link are explained in the Overtime assignments-guide.

Adding a customer to a project

Adding an existing cutomer to a project

Next we'll go through customer setting and how to add customers to a project. Adding customers to a project enables you to differentiate work hours on billing reports and use the information for billing the customers.

You can find customers and their settings under the "Projects organization and billable clients" -title. Pressing "Customers" -link under the title brings up all the customers that are already attached to the project. If there are no customers added to the project, the link states "Add customers for project".

You can also choose how employees are added to the project.

If the project has only one customer, you can select the customer in the "Project's customer"-field.

You can view all of the project's customers by clicking "Customers" in the "Projects organization and billable clients"-section.

 

To add more customers to a project, you can select them from the customer-drop-downlist below the project's old customers. Customers can be filtered with keywords or using the filtering settings.

You can also choose multiple customers at the same time.

When you have selected the customers from the list, confirm the selection by clicking the "Select chosen customers from the list"-button.

After adding the customers, they should be visible in the project's customer-list.

Adding a new customer to a project

You are also able to create a new customer. For this the "Customers"-section should be open.

Tuntinetti informs that a new customer is made. Every customer must have customer ID and a name. Here are some fields that can be added in the customers information:

  • Customer ID

    This field can't be empty. So if the customer doesn't have an ID, a hyphen can be entered instead. ( - )
  • The customer's cost center ID can be entered in the "Additional ID"-field
  • Official name of the customer
  • A time stamp id can be entered in the "Additional id"-field
  • By default the customer is in use. A customer can also be marked as inactive by unchecking the "In use"-check-box.
  • The "Customer details"-button opens up a window, where you are able to enter detailed information about the customer.
  • With the "Pricing"-button you can modify the customer's pricing.

    More information about pricing can be found in the Billing and pricing-guide.
  • Main offices can be modified if the check-box next to the heading is checked.

Adding a task to a project

Let's add a task to a project. Defining tasks is helpful when reporting work time.

 

Tasks can be viewed by clicking the "Tasks"-button. If the project doesn't have any tasks yet, the button says "Add tasks for project".

A new task can be created by clicking the "Add a new task"-button.


You are also able to copy a task from another project. By clicking the "Create new tasks by copying from other projects"-button you enter a task-window where you can select other projects' tasks to be copied.

  • Select a unit and a project, which has the task needed.
  • The projects that match the search are visible.
  • You are also able to copy the skills and qualifications that are joined to the task.
  • Confirm the selection.

The added tasks should be visible in the tasklist.

Adding a compensation item to a project

You can add compensation items in the "Add compensation items for project"-section. However it is recommended that you use the Project wizard to edit the compensation items. Project wizard can be found in the right side of the page, under the button "<<".

 

In order to modify compensations, open the Project wizard.


  • After opening the wizard, select the project's unit and press the plus -icon next to it.
  • Press "Select" -link next to the project you wish to add the compensations to.
  • Project's information are now open below the unit list. Select "Organisation costs".
  • Press "Manage organization cost".
  • Now you can see all the compensations that are already created. You can add these to the project by crossing the square under "Organization costs" -title. Another option is to create new ones by pressing "Create a new organization costs".

Creating new organization costs

  • Press "Create a new organization costs".
  • Enter the information to the opening page. Name is compulsory. After doing this, press "Next".
  • In the next page, fill in the pricing information. Short name is compulsory. It allows the program to identify the compensation based on it's short name, thus making it easier to enter the compensations.
  • Press "Next" again. This saves the organization cost and you can now add it to the project like any other cost.

 

More information about organization costs can be found in the Compensation items-guide.

Units

Adding a manager to a unit

Managers can be added to a unit in the "Units"-tab. First you must select a unit in the top part of the page.

A list of the current managers are in the unit's information in the "Managers and users' rights"-section. New managers can be named in the windows below the manager-list.


You can filter desired employees according to unit and then choosing them in the right side selection window. You can select more than one employees with the CTRL-button and consecutive rows with the SHIFT-button. The selected employees can be named as managers by clicking the "Name users selected from list as unit managers"-button.

You can also remove managers with the "Remove"-button.

 

More information about units can be found in the Units-guide.

Customers

With the Client Relationship Management of Tuntinetti you can archive customized documents, customer data and detailed contact information of customers of your company. More about Tuntinetti's CRM can be found in the Customers-guide. 

Adding a new customer

You can search customers in the Customers-tab. You can use the Search field in the top part of the page and select the desired customer in the "Search results"-drop-downlist. Another way to search customers is to use the search function leaflet. The leaflet can be accessed by moving your mouse on the arrow marks ( >> ) on the left side of the page. This opens up a window where it is possible to search customers by detailed information.

 

Adding a new customer starts with clicking the "Create new"-button next to the keyword search. "Add new customer and detail" creates a new customer with a detail at the same time. If you know that you're going to add a detail to the new customer you're creating, that is a simple way to create both at the same time. Of course you can always add details to customers afterwards also.

When creating a new customer Tuntinetti informs that the official name of the customer and the business id are the only obligatory fields. We advice to enter all the information about the customer that is possible to enter. If you want to fill some information later that is left empty in the creation phase you can always come back and fill in or modify the customer's information by selecting it in the search result list. The customer's information are listed and gone through in the Adding a customer-guide.

The pricing setting can be modified by clicking the "Pricing"-button. More information about pricing can be found in the Billing and pricing-guide.

Adding a contact person to a customer

Adding a contact person to a customer in the Customers > Contact persons-tab.

 

You can add a contact person by clicking "Add a contact person". This opens up blank user contact information and customer information. The obligatory field in user contact information are first name, last name and personal e-mail address.

 

When you have added the contact person's information you can add the customer's info. Write the customer's official name and choose it from the list that appears under the field. By choosing the customer its information automatically update to the page.

 

More information about Contact persons-tab's functions can be found in the Contact persons-guide.

Adding a detail to a customer

Adding a detail to a customer in the Customers > Details-tab.

 

To add a new detail you must click "Add" on the bottom of the page. This opens up a section where you are able to write down the information of the new detail. Details are customer-specific and it is possible to add alarms and topic related notes.

 

More information about Details-tab's functions can be found in the Details-guide.

Salary calculation

With Tuntinetti you can handle the salary calculation easily and Tuntinetti is able to factor in the terms of collective labor agreements automatically. More information about salary calculation can be found in the Salary/Wages calculations-guide.

Browsing salary sheets

You can browse salary sheets in the Salary/Wages calculations-tab. Next we'll go through how you can select the parameters for a salary sheet.

 

First you must select a time period and desired employees. When these have been selected the "Select salary sheet" drop-down list will be updated to have the desired salary sheets. There you can choose a certain salary sheet.

You can filter employees by their salary mode, labour agreement, or payment date. "Create salary advice for monthly salary employees with" -menu allows you to choose how the calculation is done for employees with monthly salary.

Creating a new salary calculation

New salary calculation can be created in the Salary/Wages calculations-tab. The following explains only the creation of the calculation. Not other operations that need to be done also, like approving work hours (They need to be approved that the calculation would have content.). More information about the salary calculation steps can be found in the Salary/Wages calculations-guide.


First you must select a time period for the calculation. Then you must select an employee in the selection window.

You can select multiple units and employees. If more than one employee is selected the calculations will be listed one below another. Consecutive lines can be selected by drag-selecting with mouse or with SHIFT key and individual lines with CTRL key.

 

A new calculation can be created by clicking the "Create new"-button.

The information that is possible to enter to a salary calculation:

  • Pay period title
  • Payment date
  • Salary template
  • Salary period in taxation
  • Tax card information (A new tax card can be added with the "Add"-button.)
  • Annual reporting payment type
  • Salary payment account number
  • Labour union account number
  • Garnishment account number

A summary of the work hours can be viewed by hovering your mouse on the question mark icon (). By clicking the button you can view more detailed information about the work hours.

Payment data

Before you are able to download payment data, you must enter a payment id in the company's basic information. This can be done in the Basic settings > Company's basic information-tab in the "Payment ID"-section.


The payment ID is used when payments are transfered to a bank. You should be in contact with Tuntinetti customer service about the Payment ID.


Payment data can be downloaded by clicking the icon in the top part of the Salary calculation > Salary advices-tab.

Examining period reports

When salary information has been transfered to payroll in the Salary/Wages calculation-tab, they can be formed into period reports in the Period reports-tab. The period reports can be transformed into files that are needed for example in account programs and in taxation.

 

First, select period or date range, from which the salary information is fetch.

You can filter units and employees:

  1. All, also outdated

  2. New and existing

  3. Only valid

  4. With markings

  5. Without markings

If you want, you can filter the list of employees on the basis of the labour agreement.

You can also filter according to employees' skills.

  1. Select checkbox or "Select desired skills and qualifications" link to open the skill window.

  2. Choose the skills you want to use for filtering, by selecting checkboxes next to the skill names.

  3. This filter can be deactivated by unselecting the "Filter according to employee skills" checkbox.

Select unit(s)

Select employee(s)

If salaries of the selected period has been set to be paid for the selected employees, they appear under the filter menus.

 

With the icons on the top-right part of the page the period report can be exported or printed.

Vacation calendar

Viewing the vacation calendar

Newt we'll go through the vacation calendar of Tuntinetti. The calendar can be found in the Time management-tab on its own tab called "Vacation calendar".

 

Start by choosing the month which vacations you want to view.

When you have selected the month, click Show month.

Alternatively you can set the range freely for example to cover two months.

When you have set the range click Show range.

Then choose the unit or units, which vacations you want to view.

You can choose multiple units at once. Consecutive rows can be selected with the SHIFT-button and single rows with the CTRL-button.

Lastly choose the employees. You are able to view single or multiple employee's vacations.

Each employee's vacations from the chosen month or range is now shown in green in the calendar.

More information about Vacation calendar can be found in the Vacation calendar-guide.

Sick leave management

The following demonstrates sick leave management in Tuntinetti. In sick leave management administrator or superior can add, view and modify sickleaves. This can be done in the Sick leave management-tab.

 

Viewing and modifying sick leaves

Administrator or superior is able to view and modify every employee's sick leaves.

Start by setting the date range, which sick leaves you want to view.

Next click Search-button.

Now all sick leaves from the chosen date range are visible in the table.


 

By clicking the Enabled-box for a sick leave you can accept it to be payed.


 

You can change the type of a sick leave and it is possible to delete a sick leave by clicking Remove.


 

Remember to save all the changes.

 

You can filter sick leaves based on the type of the sick leave and whether they are enabled or not enabled. 

When you have filtered the selection the table will only show the sick leaves that mach the filter.

 

More information about sick leave management can be found in the Sick leave management-guide

Work shift cycles

A Work shift cycle

Next we'll go through work shift cycles. Cycles that concern the whole company can be modified in the Company's basic information-tab.

 

A work shift cycle must have a Valid from-date and a Start date. The length of the cycle should be entered if it is not defined in the labour agreement.

The default length for the workshift cycle is set by labour agreement. Typically, the length on the labour agreement level is 1, 2 or 3 weeks. When you need to set deviant workshift cycles, the lengths of the period is set in: the company's basic information for company level, the unit settings for unit level and in employee's contract settings for employee level. Settings are inherited from the unit's settings to unit's employees, either on the grounds that the employee is positioned to the unit in question or that the unit has been selected in the "Work time cycle group" in the additional settings of the employee's contract.

Work shift cycle's information

Let's go through how you can modify a cycle.

 

Enter the Valid from-date.

Enter the Start date.


The work shift cycle's length can be entered in the "Work shift cycle weeks"-field if the check-box is checked.

The cycle's repetition settings can be modified in the "Workshift cycle repetition"-column.

You can remove a cycle with the "Remove"-button.

Time reports

Searching a time report for payroll

Selecting month or time frame

First select month or time frame you would like to see. Depending on preview mode, chosen month/start and end date will refresh automatically or you have to press "Show month" or "Show range".

Selecting units and employees

Choose first the unit(s) and then the employee(s) you want to be shown on the report.

You can select multiple units and employees. Consecutive lines can be selected by drag-selecting with mouse or with SHIFT key and individual lines with CTRL key.

Employees reports open automatically below selection menus, everyone to their own worksheet, if "Auto-refresh" Preview mode is selected. If "Refresh on-demand from show-button" is selected, remember to press "Show" after selecting the employees.

 

The report:

  • A number in brackets is the week number.
  • If employee contracts are up to date, Tuntinetti is able to check whether the employees have done overtime or not.
    • If there has been overtime, and employee doesn't have overtime assignment, Tuntinetti will suggest to fill in the missing overtime assignments.
More information about overtime assignments can be found in the next section and in the Overtime assignments-guide.
  • Underlined day is the day on which the work time cycle begins.
The length of the work time cycle can come from the labour agreement as such (can be e.g. a normal 1 week or e.g. 3 weeks, typical for the restaurant sector). The starting date for the work time cycle can be defined in the work time cycle settings.

Creating an overtime assignment

Introduction of overtime assignments

In Tuntinetti, overtime isn't recorded separately, but the program analyzes them automatically when overtime assignment is in effect. In order for the program to itemize overtime hours, the employee must have at that time a valid overtime assignment and contract.

In Tuntinetti, the overtime assignments are normally given one by one and case by case. But if it is necessary to have all the employee's hours itemized into payroll work time report according to the valid labour agreement, it is possible to set the overtime assignment (itemized list of work time compensations) to be always valid. These default overtime settings can be set for units, projects and employees.

  1. Unit level is on the bottom.
  2. Project level is over unit-stage but under employee-stage. This might be the reason why a change to the unit-stage's overtime assignment hasn't affected.
  3. Employee level is on the top.

Adding an overtime assignment on the unit level

Adding an overtime assignment on the unit level takes place in the Units-tab.

 

Make sure that you have selected the desired unit in the "Choose the unit you want to edit"-drop-downlist.

Overtime settings can be found in the "Work time settings"-section.

You can select from "Work time compensations (overtime, extra) according to CBA" menu which overtimes and extras are going to be itemized in the time reports for payroll (Units > Work time settings). These settings apply to all employees of the unit, unless  defined otherwise on project or employee level. 

From "Overtime additives and other additives compensated as free time" and "Overtime base hours compensated as free time" menus you can select which overtimes and extras will be compensated as free time.

A tooltip of each field can be viewed by hovering your mouse over the headings.

Adding an overtime assignment on the project level

Adding an overtime assignment on the project level takes place in the Projects-tab.


Make sure that you have selected the desired project in the "Select project for working hours control"-drop-downlist.

Overtime settings can be found in the "Work time settings"-section and clicking the "Additional options"-button.

You can select from "Work time compensations (overtime, extra) according to CBA" menu which overtimes and extras are going to be itemized in the time reports for payroll (Projects > Work time settings > Additional options).


From "Overtime additives and other additives compensated as free time" and "Overtime base hours compensated as free time" menus you can select which overtimes and extras will be compensated as free time.

A tooltip of each field can be viewed by hovering your mouse over the headings.

You can select "The employee can select overtime", which allows employees to set overtime assignments for themselves.

 

From "Other settings" menu, you can select the project work time decomposition setting to override possible employee work time decomposition settings.

Adding an overtime assignment on the employee level

Adding an overtime assignment on the employee level takes place in the Users > Employees-tab.

 

Make sure that you have selected the desired employee in the "Select user to edit"-drop-downlist.

Default overtime settings can be found in the "Default overtime settings"-section.

You can select from "Work time compensations (overtime, extra) according to CBA" menu which overtimes and extras are going to be itemized in the time reports for payroll (Users > Employees > Default overtime settings).

From "Overtime additives and other additives compensated as free time" and "Overtime base hours compensated as free time" menus you can select which overtimes and extras will be compensated as free time.

A tooltip of each field can be viewed by hovering your mouse over the headings.


More information about overtime assignments can be found in the Overtime assignments-guide.

Pricing

Setting up a pricing for a project

Price lists can be set in several different ways with the accuracy of customer, employee and project. This example uses project's price list. Open up "Projects" tab. Project's price list can be found in the "Basis for billing" section. Price list window opens with the "Pricing" link. Additional information about the price list can be shown by moving mouse pointer over the question mark icon ().

You will see the price lists set for the project in the pop-up window. If the project doesn't have a price list yet, "Price list is not set yet" text will be shown in the field. Listed price lists can be filtered with the "Show" options at the top. Tooltips for the filtering options can be displayed by hovering the mouse pointer over them.

Price lists can be set in two different ways:

  1. Create pricing (Button opens a window for creating new price list)
  2. Choose pricing (Button opens a window, from where you can select a previously created price lists)

Buttons can be found below the list of price lists.

 Price lists can be exported to a spreadsheet program, by pressing the () icon at the upper right corner of the list. Please note that the listing will only show the price lists of the project's unit.

 

More information about pricing can be found in the Billing and pricing-guide.

Pricing levels

The following explains, from where the different price lists can be found and what is the imperative order of them.

The imperative order of the price lists

1. Price of the project's employee

2. Customer charges the price list

2. a) Price of the task

2. b) Price list of the customer

Can be found by pressing the "Customer details" link in the project's customers section. This opens a window, from where you can find customer's "Pricing" link. Alternatively you can also go to "Customers" tab.

Price list of the customer's headquarters

Same as the previous "Price list of the customer", but edit the price list of the customer's headquarters.

2. c) Price list of the customer headquarters' unit  

2. d) Price list of the customer's unit

Same as previous "Price list of the customer headquarters' unit", but edit the price list of the customer's unit.

2. e) Price list of the project's customer

3. Price of the task

4. Price of the project

5. Price of the project's unit


More information about pricing can be found in the Billing and pricing-guide.

Calibrating work hour balances

Usually when you begin using Tuntinetti, employees have flextime or other hours saved in the old system (For example annual leave or overtime leave). So that the hour balances match, they must be calibrated/copied to Tuntinetti. This means that they must be set for each employee separately.

Finding the time report which is calibrated

Let's go through how it is possible to alter the balances in the Time reports for payroll-tab.

First select month or time frame you would like to see. Depending on preview mode, chosen month/start and end date will refresh automatically or you have to press "Show month" or "Show range".

And the desired employee from the according unit.

The time report will be updated below the selection windows. In the ending of the report are the balances.

Editing the balances

By clicking the "Edit"-button you are able to edit the balances.

 

More information about altering time reports can be found in the Time reports for payroll-guide.

Tuntinetti's paid features

The paid features of Tuntinetti diversifies the usage of the program concerning time management, billing and work shift planning. If you have the manager rights, you can select which additional features are activated or removed.

The management of the additional features can be done in the Basic settings > Tuntinetti's paid features-tab.

The page contains a list of the features that are available.

When you hover on a question mark with your mouse, you can read a tip.

The second column has a mark in it, if the feature has been used in the present month.

You can activate a feature by checking the feature's check-box. If you want to deactivate one, just uncheck it.

Notice that some of the features have correlations.

For example if the Transfer to billing can be activated, the Project and customer invoice reports and pricing must be active as well.

Confirm the activations by saving your changes with the "Save changes"-button in the bottom.

Tuntinetti charges only by the features used not when a feature is activated but not used. Every feature costs one coin per service uder per month.

You can see your coin balance in the right part of the page.


 

If your coins are about to run out, there will be a "Buy more coins"-button under the calculations.

 

You can also monitor the usage of features in the bottom of the page in the "Browse account logs"-section.

More information about Tuntinetti's paid features can be found in the Tuntinetti's paid features-guide

Training and remote training about using Tuntinetti

Learn to use Tuntinetti in a couple of days! Tuntinetti offers training for basic users to main users. Contact Tuntinetti sales (+358-(0)9-6898 8221) and we'll tell you more.


By purchasing a training session, you ensure your know-how. Time will not be wasted, work hours will be effective and you can set up your settings right.

 

Our instructor will come to your work place for one or more whole work days and makes sure that your main users will learn to use all the features in Tuntinetti.

 

In addition to coming over learning can be done online. Tuntinetti offers remote training in the form of Webinars.

 

We arrange regularly Webinars concerning the topics that our clients wish for. Our Webinars are designed so that they can be attended by basic users that rarely make changes and users that use Tuntinetti more regularly.

 

You can 

 

Tuntinetti haltuun parissa päivässä! Tuntinetti tarjoaa koulutusta peruskäyttäjistä pääkäyttäjiin. Ota yhteys Tuntinetin myyntiin (+358-(0)9-6898 8221) ja kerromme lisää.

Koulutuksen ostamalla varmistatte oman osaamisenne. Aikaa ei kulu hukkaan, työajan käyttö on tehokasta ja osaatte laittaa asetuksenne oikein.

Kouluttajamme tulee luoksenne yhdeksi tai useammaksi kokonaiseksi työpäiväksi ja huolehtii, että pääkäyttäjänne oppivat Tuntinetin kaikki toiminnot.

Asiakaspalvelun kautta voi kysyä lisätietoja helposti sähköpostilla: asiakaspalvelu@tuntinetti.fi

Lähikoulutuksen lisäksi Tuntinetti tarjoaa etäkoulutusta webinaarien muodossa internetin välityksellä.

Järjestämme säännöllisesti asiakkaiden toivomia webinareja ajankohtaisista aiheista. Webinarit on suunniteltu niin, että ne palvelevat sekä Tuntinetin aloittelijoita ja harvoin muutoksia tekeviä, että säännöllisesti järjestelmää käyttäviä harjaantuneita käyttäjiä.

Webinaareihin voit ilmoittautua täällä: Ilmoittaudu Tuntinetin Webinaareihin.